پروژه های انجام شده توسط شرکت بیستون

Photo GalleryPhoto Gallery

Table-1: BRMS projects (by name)

 

year

Constructor

Consultant

Employer

Projrct’s name

No.

1996

Rah e Sahel Org.

Mahab e Ghods Consultants

Iran’s Water and power resources development Bureau

Dasht e Abbas Water transmission tunnel (Katkhah dam)

1

1996

Sepano Engineering Co.

Bandab Consultants

Ardabil and East Azarbayejan Water Bureau

Water diversion and transmission tunnels (Aidighmush dam)

2

1996

Sab Engineering Co.

Bandab Consultants

Ardabil and East Azarbayejan Water Bureau

Water diversion and transmission tunnels (Gharanghu dam)

3

1997

Melli sakhtoman Co.

Lar Consultants

Tehran Water Bureau

Water diversion tunnel (Mamlu dam)

4

1997

Katra Engineering Co.

Parab Fars Consultants

Fars Water Bureau

Izadkhast dam

5

1997

Pars Garma Engineering Co.

Sakku Consultants

Fars Water Bureau

Syvand dam

6

1997

Perlit Engineering Co.

Kuhrang tunnel Consultants

Tehran Municipality office

Resalat freeway tunnel

7

1998

Katra Engineering Co.

Tehran Sahab Consultants

Mazandaran Water Bureau

Water diversion tunnel (Meijaran dam)

8

1998

Road development Org.

Sharif industrial University

Ministry of Road and Transportation

Kandowan road tunnel

9

1998

Daelim Engineering Co.

Moshanir

Consultants

Iran’s Water and power resources development Bureau

Masjid e Soleiman dam

10

1998

BRMS

BRMS

Tehran Water Bureau

Lar dam (Repair and replacement of monitoring instruments)

11

1999

Melli sakhtoman Co.

Laniz Engineering Company

Tehran-Caspean Sea Highway Company

Taloon Tunnel (Tehran-Caspean Sea Highway)

12

1999

BRMS

BRMS

/ 0 نظر / 47 بازدید